แสดงบทความที่มีป้ายกำกับ Building แสดงบทความทั้งหมด
แสดงบทความที่มีป้ายกำกับ Building แสดงบทความทั้งหมด

วันอังคารที่ 27 มีนาคม พ.ศ. 2555

Prefabricated Building Materials

Prefabricated building materials are used for buildings that are manufactured off site and shipped later to assemble at the final location. Some of the commonly used prefabricated building materials are aluminum, steel, wood, fiberglass and concrete.

Prefabricated metal buildings use galvanized steel and galvalume as the chief materials for building. Galvalume is a form of steel coated with aluminum-zinc. This is to protect the building against corrosion, rust and fire. It also provides a sturdy and protective covering to the prefabricated building. Almost all the components of a metal building such as beams, frames, columns, walls and roofs, are made of steel. Most prefabricated military buildings use steel or aluminum frames. Synthetic materials are used for the walls and roofs. To provide enhanced security, a combination of both metal and cloth materials are used. Plastic flooring materials can be quickly assembled and are very durable.

Prefabricated building materials used for small prefabricated buildings are steel, wood, fiberglass, plastic or aluminum materials. These materials are cheaper than regular brick and concrete buildings. Materials like steel, fiberglass, wood and aluminum are used as prefabricated building materials for sports buildings. These materials provide flexibility and are preferred for making structures and accessories like stands and seats for stadium and gyms.

For making low cost houses, prefabricated materials like straw bale, Ferro cement, Calcium silicate products, composites and other cheap wood based materials are currently being used. Calcium silicate bricks are strong and durable. Ferro cement consists of a cement matrix reinforced with a mesh of closely-spaced iron rods or wires. In this type of construction, the techniques used are simple and quick.

Using prefabricated materials one can make durable, water and fire resistant and cheap prefabricated buildings. Most of the prefabricated building materials are eco-friendly and affordable.

Thanks To : Buy Best Price Buy Cheapest Best Discounts LCD TV Best Deals Review Latest Electronic Gadgets

วันพุธที่ 4 มกราคม พ.ศ. 2555

How to Form Building Footings

You should be able after reading this, to perform simple forming methods for linear footings and pier footings for a basic foundation. I will cover optional ways to form foundation walls as well. Along the way I will leave you hints that will either be ways to save money, safety items or perhaps a reference or two for you to go to for more information if you need it.

Linear Footing Formwork- Linear footings is a fancy word for strip footings that you may have seen being placed under a new house or garage. They are the first basic piece in the foundation system you will need for your project. Linear footings may form a square, a circle, an arc or perhaps just a projection sticking out from the main building that will support a knee wall or a retaining wall.

Observe therewill be several men involved as well as the use of wheelbarrows to haul the concrete and place it in the footing forms. Also note the small squares in the center of the excavation are for a pier footing that may support a column later on. The concrete is placed and leveled off flush with top of forms.

Materials: Materials for footings can range from dimensional lumber such as a 2" x 12" or 2' x10" to plywood, scrap lumber pieces, or any other wood you have laying around. Typically, footing lumber can be used over and over again to save money. 12 penny,10 penny and 8 penny common nails, some string line, pencils, level, ruler or measuring tape and a tripod and bubble level. A tripod and level can be rented by the day from most Rental centers. They will show you how to set it up and use it if you need help. A string line bubble level is approximately $2.00 at most home hardware stores.

Tools-Long handled pointed shovels, short handled square shovel, hammers, pick, 12 pound sledge hammer, tie wire, and a chalk line box.

Reinforcement- In most parts of the country steel reinforcement is required in foundation footings. It could be 2-#5 bars continuous or 2-#6's and this information will be shown on your building drawings. Reinforcement bar sizes are based on 1/8" increments of 1". So #5vbar is 5/8" thick, #6 bar is 6/8 or ¾" thick and so on. Bars range from #3 to ##24 but will never see anything larger than a #7 in any typical house footing. Rebar (for short) is available at home centers, lumberyards and if you have a local steel supplier in the phone book, they may deliver as well. Rebar comes in 20' or 30'lengths with 20' lengths which are easier to handle and are preferable. You can bend a #3, 4 or 5 in a simple jig made of stacked cement blocks or a trailer hitch on a pickup truck. It will take some effort but there aren't that many to bend.

Cutting rebar may be done with a demolition saw or a skill saw with a carbide blade although that is much slower. WEAR SAFETY GLASSES AT ALL TIMES! Flying debris from the saw blade and sparks can cause serious eye injuries. Watch the sparks as well. Be aware of where you're working and have a firm footing when doing this work. Make sure no one is standing in the path of the cutting debris or sparks.

Rebar installed in a pier footing. Many footings have 2 or 3 continuous bars tied together end to end for added strength of the footing. Walls may have just vertical bars or both vertical and horizontal bars in them.

Installation: Here's the fun part where you actually see something getting done. Once you have performed the layout of the building lines, you are ready to start installing the formwork. Remember, this is not cabinet or finished work that will be seen later on. It is simply a temporary form to hold the concrete in shape until it dries. When your concrete is hardened, YOU RIP ALL THE FORMS BACK OUT! While we are here, when you have finished and poured your footings, remove ALL wood from around the work. Leaving wood in place and burying it will draw insects and especially termites. They just love damp wood. This will be a serious problem later on. Take your time to clean it all out. Start in one corner of your foundation (we will for now assume it is a rectangle) and start laying out the longest lengths of lumber you have to use. Your drawings will tell you if your footing is 20" wide and 10"' deep or 24" wide and 12" deep and so on. The first number given such as 24" x12" typically means the width of the footing is 24", and the depth is 12". Typical means this is the size used everywhere unless the architect shows a different size in a specific place. If your footing is 24" x 12", you would be using 2" x12" x 12' or 10' dimensional lumber marked as SPF. (Spruce, Pine, Fir). In different areas of the country, faming lumber could be Southern Yellow Pine, white pine or other most common and cheapest wood available. Remember, this is not structural framing lumber so there is no reason to buy the highest priced wood for this work. Buy the Cheapest!

OK so you worked your way all around the building and find out the building doesn't fit your lumber lengths. Amazing! Say the building is 42' long. by lapping your forms one foot each, you will only get 39' from 4 10' pieces and you need 42'. Now you are allowed to cut some pieces to fit the corners. Try to keep the cutting to a minimum so you can save your lumber for another project. OK, now we have lumber laid out all the way around the foundation. Holding the lumber in place can be done by several methods and all are fine.

Formwork can be held in place by using wooden stakes, steel stakes, perforated strapping steel tape, or wood spreaders. Steel stakes are quicker but are expensive to buy. If you can rent a box of 24 or 48, do so as they greatly speed up the work. If you are using wood stakes you have to purchase some 1" x 3" x12' lumber for cutting of stakes. If your ground is very soft or wet, the stakes may have to be 30"-36" long, if the ground is firm 24" long stakes will do. Cut a point on each stake and make a couple of dozen of them to start. Stand your first footing form directly under you layout line and drive a stake alongside on the outside! You have to be able to remove them later. Now keeping the form under your layout line, move along the board and place another stake at the other end keeping the entire length of the board under the string line. Make sure your form is in line with the foundation footing layout line. Place your second form alongside the first on the outside and lap it 1" over the first. Drive a 16 penny duplex nail in the lap to hold it while you work along. Third form; place it to the inside of the 2nd board, lapping it one foot as well. Nail these together from the outside! Continue on around the footing until you have stood forms for the entire exterior of the footing including corners. Lapping in and out all the way around. Now start your inside form. Stand the board 24" away from the outside form board and hold it in place with either a 28" piece of the 1" x3" lumber scrap keeping a minimum of 24" between the forms. The building inspector will check this dimension. He/she does not care if it's slightly larger but he/she will fail it, if it's less than 24". Again work all the way around your footing until you have a full rectangle with a form board for both the inside and outside of your footing in place.

Now is the time to begin making your forms strong enough to hold the weight of the concrete. Starting in one corner, add enough wood stakes, nailing each one as you go to the formwork with 10 penny duplex nails. Steel stakes have pre-drilled holes in them so you simply insert the nail in a hole and drive it in. Continue this until one side is secured soundly. Now stand the inside forms making sure you maintain the minimum width required by your drawings. Install "spreaders" made of scrap lumber across the top of the forms to hold them apart and help hold them from tipping over when the concrete is placed inside. Continue on all the way around the footings until all forms are nailed and staked. NOTE: As you proceed with the formwork, using your level and tripod, make sure the forms are LEVEL! They are of no use if they weave up and down and will make installation of the foundation itself, nearly impossible. If you encounter rock or other obstruction, ask your building inspector how he/she wants to see the footing formed at that location. They may allow you to pin the rebar to the rock, ask that some of the rock be removed to provide a level surface and so on. Now install the rebar. Just slide the long lengths under your spreaders making bends at the corners. Using tie wire, hang the bars from the spreaders so the rebar is located within the bottom 1/3 of the footing height. 12" high footing? Hang the bars 3-4" above the ground. This will help provide the strongest footing you can make. When all rebar is complete, call for inspection and take a rest.

Placing the concrete-When pouring a large footing or foundation, you will most likely purchase the concrete from a Redi-mix concrete supplier. They will want to know, how many yards you need, what strength concrete and what time of day you would like it to be on site. Have your information ready. Order two days before you need it and check again on the day it is supposed to be delivered to make sure there will not be any delays. Weather, plant breakdowns and even manpower can sometimes delay truck delivery times. They will get there as closely to the hour you requested as possible. BE READY! When the truck shows up is not the time to find out you have a flat on the wheelbarrow or can't find the shovels. Have your tools and manpower ready. Most companies allow up to 1 hour on site for unloading. After that you pay additional time charges for the truck and the driver. It can get costly! Unless you are superhuman and very well experienced do not try and unload 10yds of concrete with only 2 people. You most likely will spill more than you use, the concrete will get hard before you finish it and rushing around can cause an injury. Be prepared with sufficient manpower.

After the concrete is placed in your forms and roughly troweled off to the top of the forms, take a few minutes break. The concrete will start to setup and if your plans call for vertical bars in the footings for the new foundation walls, this is the time to install those. They should all be pre-made and laid out roughly where they are to go in the footings. Again, plan ahead. You may "stab" these rebar into the wet concrete, wiggling them around slightly to get the concrete to fill in around the hole you made. Your plans will tell you if the bars go on the inside or outside "face" pf the wall or in the center and how far apart they are to be. "Inside" and "Outside" face simply means the inside or outside of the new all. Most times the bars are to be placed 2" away from the face. Your drawings will tell you this information. Starting in one corner, install one bar in intersection of the corner and then measure whatever dimension the drawing shows for centers. 32" on center (O.C.). Just measure over 32" and install the next bar and so on. When you come to the next corner, make sure one bar is at the corner intersection center again. You can add extra bars of you have a question, just don't add too few.

Next day. Now that you found the muscles you never knew you had (just a little sore?) it is time to strip all the formwork off the footings. Yes all that great form work you did is now just scarp lumber pile material. Take ALL wood out of the foundation area. Rotting wood underground draws termites and other nasty insects! Footings are complete.

Foundation forms completed and filled with concrete. Not child's play!

Foundation walls: Walls may be constructed of concrete block units (Masonry or CMU), poured concrete, pressure treated wood and today even Styrofoam foundation blocks are available. Whatever the type you are using, if you did a good job on your footings and they are nice and level, the walls are going to be easy to install. If your foundation is masonry, your work is done. Your mason will now layout the wall locations, lay the CMU, pour the CMU cells that have the rebar in them and install the straps for the sill plate for the house, shed, garage, etc. Make sure his contract includes all this work and materials. If the foundation is concrete, the concrete contractor will bring all the forms with him. Again, make sure all the formwork, wall ties, rebar required, windows and other accessories are included in his contract. It is possible for a homeowner to form and pour a foundation but it is not child's play. For rentals, rebar installation for the walls, actual placement of the concrete, how to use the trucks properly and possibly the use of a concrete pump are all best left to the pros. Concrete is extremely heavy when wet. Improperly constructed wall forms can result in a "blow-out" of the formwork and serious injury or death can result.

Footings are the basic and first building block of your project. Sheds may sit only on 4 solid concrete blocks but those are the footings. They too must be solid and level to provide a good footing for your shed. Take your time and do it right and the rest of your building will be easier to keep plumb and level.

Hopefully this has given you lots of ideas and information on the right and wrong ways to install footings. Whether it is a large or small project, the theory is the same. Take your time to read your drawings, always use safety glasses when using a power tool or placing concrete.
Pete

Your Friendly Building Inspector

http://www.Wagsys.com

BICES-Building Inspection & Code Enforcement System Software

See Also : Buy Best Price Buy Best Price Tablet64GBWifi3GMC497LL Civil Engineering Overview New Laptop Best Deals

วันอังคารที่ 27 ธันวาคม พ.ศ. 2554

GREEN BUILDING MATERIALS-CRESCO CONCRETE PRODUCTS LLC,

dashdoctor51's webcam video November 20, 2010, 07:02 AM Based in the Western North Carolina mountains, I am a Territory Manager for Cresco Concrete Products, LLC. We sell Liteblok - a mortarless, interlocking, easy-to-install green building block that is great for homes, offices, warehouses etc.40% cheaper than 2x4 or 2x6 wood frame and more affordable than ICF and AAC, Liteblok offers numerous benefits including an R value R-35 . I would welcome the opportunity to meet with you and show you a sample of our 8" x 8" x 16" Liteblok 38 Grande which is about 1/4 the density of typical concrete.LiteblokTM built structures are strong and perform well in high winds and during seismic activity. It is a unique product that is patented worldwide. LiteblokTM is very different from all other concrete products on the market and should not be confused with Insulated Concrete Forms (ICF) or Autoclaved Aerated Concrete (AAC).Will not burn its fire proof. This is the History of Liteblok 38 1-Largest Liteblok building: High rise building,20 family multiplexes and commercial centers. 2-Oldest Liteblok building:13 years old 3-Performance during a hurricane or earthquake or cyclones:Vanuatu in the South Pacific-7.6 earthquake with no reported damage to any Liteblok building or structures. 4-Architects should note that Liteblok is a form. It is spacefill that provides insulation and a surface to finish. The structure is the columns and beams of rebar and grout inside the blocks. This column ...

More review : Civil Engineering ห้องทดลอง My Home Patio Lawn & Garden Home Video & Audio Theater Lcdtv 3d Nx710 Deal

วันศุกร์ที่ 23 ธันวาคม พ.ศ. 2554

Chinese Building FIre Skyscraper

A fierce fire consumed all 44 floors of a skyscraper in Beijing today, shooting 30 foot flames into the air, the building never collapsed. The fire was burning from the ground floor to the top floor of the large building, the flames reflecting in the glass facade of the main CCTV tower next to the hotel and cultural center, reports the New York Times.

Recommend : คุยกับวิศวกรโยธา ห้องเรียนวิศวกรรมโยธา Jewelry Cheap Price

วันเสาร์ที่ 17 ธันวาคม พ.ศ. 2554

WALL PLATE TO CONCRETE THE START TO BUILDING BASEMENT WALLS

BOB SCHMIDT SHOWS YOU HOW TO ANCHOR WOOD WALL PLATES TO CONCRETE DURING YOUR BASEMENT REMODELING RENOVATION PROJECT.

Friends Link : หมวดงานระบบไฟฟ้าและเครื่องกล Civil Engineering Civil Engineering Latest Electronic Gadgets

วันเสาร์ที่ 4 มิถุนายน พ.ศ. 2554

Shop Drawings: Set Of Pre-Fabricated Building Component's Diagrams

Shop drawings have truly placed new standards in the field of building construction. Shop drawings have become most necessary part of every building construction project. It normally shows more detail than any other construction documents about the measurements and angles of pre-fabricated building components.
What are shop drawings and what are they used for in construction?
For any beginner, these questions are common that what is a shop drawing and what it can provide to builders and contractors. A shop drawing is a three dimensional drawing and it consisting of three detailed views like plans, elevations and sections. It is generated by professional shop drawing experts.
Such experts are capable of developing 99.995% accurate and error free shop drawings as per latest standards. Also they have greater proficiency in creating creative drawings by using latest tools and technologies. They understand even smaller detail about building's pre-fabricated components. In-depth understanding of the various aspects related to producing fabrication shop drawings remains the plus point. They have access to all the popular software to create clean, easy to read shop drawings.
Pre-fabricated building components are considered as a base in any project. Some of the components are elevators, structural steel, trusses, pre-cast, windows, appliances, cabinets, air handling units and millwork. When used effectively in construction project, such components give better stability and strength to the proposed building structure. Shop drawings do exactly the same by giving accurate details about necessary pre-fabricated building components.
Some of the areas where shop drawings are well utilized are as follow:
•    concrete shop drawings
•    rebar shop drawings
•    shop fabrication drawings
•    cad shop drawings
•    structural steel shop drawings
•    Structural Steel Shops Designing, Columns Shop Drawings, Cabinet Shop Drawings, Steel Components
Above mentioned shop drawings services will assist builders in the process of installation and coordination for sheet metal ductwork, piping, plumbing and fire protection. So whether you are a construction firm or an individual, shop drawings can bring you desired success in your business. For more information about shop drawings, please contact us at: http://www.outsourcestructuraldesign.com/shop-drawings.php or email us your requirements at: info@outsourcestructuraldesign.com now.

Tags : Computers & Accessories Cheap Price in Beauty Wheels & Tires Baby Bath Tub Civil Engineering

วันอาทิตย์ที่ 22 พฤษภาคม พ.ศ. 2554

Structural Designing: a Creative Art of Building Stable Structures

Article Source: http://www.articlesbase.com:80/customer-service-articles/structural-designing-a-creative-art-of-building-stable-structures-609915.html

Related : EngineeringThai new electronics Cheap Laptop 15.6 Inch Best Buy JUNIOR CIVIL ENGINEER

วันพฤหัสบดีที่ 25 พฤศจิกายน พ.ศ. 2553

Building Process Video 12: Slab Reinforcement

We set rebar, column templates and hardware before pouring concrete.

Visit : Women's Sandals gadgets and gizmos HDTV Best Deals Tablet64GBWifi3GMC497LL

วันศุกร์ที่ 2 กรกฎาคม พ.ศ. 2553

Stick Built Method of Building Walls Was Once Considered a Good Way to Build

Concrete C-I-C construction is not concrete blocks.

The parts of the C-I-C wall are designed to include a Concrete Tie Beam formed within the panel, has vertical concrete columns reinforced with steel, concrete on the exterior wall and the interior wall with foam in the middle. It does not require any more forming.

You can compare this C-I-C type method of construction with wood framing, commonly called stick built homes. The strength of this type of concrete wall is in the vicinity of 10 times stronger than 2" x 6" stick built homes, even when the stick built home is designed for high wind resistance. The panels are connected together by the hardening of the concrete when it interlocks with the adjacent panel, making an unbreakable connection. At the top of the rebar in the column there is a bend within the tie beam area at the top of the panel, in engineering terms the load is uniformly transferred from the tie beam to the footers. This forms a tie column from the slab to the tie beam. An 8 ft tall wall of this type of construction easily resists over 2 ½ times the force of 150 MPH winds. To recap C-I-C construction provides unequaled high wind resistance and energy efficiency while being non-flammable and non-combustible. The important part is to keep wood and drywall boards off the walls, which is easy to do with the right system.

The next important part of building with concrete is to make it so Entry Level Employees can install the panels. I will go so far as to tell you that the right system can be installed with 3 girls with zero construction experience faster than skilled carpenters can build stick built homes. Stick built homes are much weaker, the walls fuel a fire, house pests, and promotes mold growth.

There is much more information available that you need to know in regards to building the safest, healthiest, most sustainable house you can build for your family while costing you less money than building any other way.

Friends Link : Skin Care Cheap Prices by SccP for you. Civil Engineer Power Soil Test

วันจันทร์ที่ 5 เมษายน พ.ศ. 2553

วันจันทร์ที่ 8 มีนาคม พ.ศ. 2553

Building the WTC allotment 2 of 2

A 20 minute documentary about the construction of the World Trade Center. Notice how much care and attention was given to it's strength and ability to withstand damage. Also the inner core had more beams than the official story we were given after they fell. For those who think "Jet Fuel" and gravity pulverized that concrete and 45 interior steel columns. Educate yourself!



http://www.youtube.com/watch?v=4jxEg51AEDg&hl=en

บันไดคอนกรีตเสริมเหล็ก